Every square foot you lease costs money whether anyone sits in it or not. Space planning is the stage where that gets decided: how many desks the floor plate really takes, how many meeting rooms you need against how many you think you need, where the noise goes and where the quiet goes. We draw it before anything is built, test it against the building services and the fire strategy, and change it on paper where changing it is free.
Free site surveys · Fixed quotations · Bournemouth to Birmingham

What the floor plate genuinely holds at a workable density, with circulation, storage and future headcount allowed for.
Two or three layout options drawn against the same brief, so you can see the trade-offs rather than being handed one answer.
Rooms sized to the meetings you actually hold, with acoustic separation where concentration work happens.
Layouts checked against services, sprinklers, fire escape and ceiling grid before they go anywhere near a price.
That depends on the shape of the floor plate, the core position, the window line and how you work. As a working figure, open-plan office space in the UK is commonly planned somewhere between eight and twelve square metres per person once circulation, meeting rooms and storage are included. A survey and a test fit turn that range into a real number for your building.
Not always, and we will say so. If you have a clear brief and a straightforward rectangular floor, we can go almost straight to a layout and a price. Space planning earns its money on awkward floor plates, hybrid working, multiple departments with different needs, or where the meeting room demand is not obvious.
Yes, and we do it regularly. If a design is already drawn, we price and build to it, and we will flag anything that will be difficult, expensive or slow to build before it becomes a problem on site rather than after.
Usually fewer large ones and more small ones than people expect. Most bookings in a typical office are two to four people, so a floor with one twelve-person boardroom and no small rooms tends to be permanently blocked. We look at how your rooms are booked now before drawing new ones.
Significantly. Room positions relative to the ceiling grid, the sprinkler layout and the window mullions can change the partitioning cost noticeably, and running rooms across the grid rather than with it adds work everywhere. Getting the plan right is the cheapest saving available on the whole project.
A drawn layout you can hand to anyone: floor plans, room schedule and enough detail to price the build against. If we go on to do the fit-out, that drawing becomes the basis of the construction information rather than being started again.